New SGT200 burner changeout kit supplied swiftly to Africa
EPS recently created a SGT200 burner changeout kit for a customer in Africa. The kit contained all the shims and gaskets in a handy case to make the job of burner changes easier. We also do a second kit complete with a digital vernier with a special depth attachment to allow direct measurement of the swirler depths, burner lengths and shim thicknesses. This is along with a copy of our spreadsheet which details how to do the measurements, then calculating the required shims.
If you require a SGT200 burner changeout kit get in touch with our team. We can supply all sorts of bespoke kits to make routine jobs much easier.
SGT200 burner changeout kit
100 gaskets
24 of each of the following
0.1, 0.25, 0.5 and 1.0 mm thick stainless shims
Optional
Digital vernier with small foot attachment for measuring burners
Digital depth vernier
0-25mm micrometers
All supplied in a Pelicase with each of the shims and gaskets boxed and labelled separately.
SGT200-1S & SGT200-2S
The rugged and compact SGT-200 gas turbine is available as a single-shaft version for power generation (SGT200-1S), and as a twin-shaft turbine for mechanical drive (SGT200-2S). The gas turbine operates with various gaseous and liquid fuels. It provides high efficiency and an excellent power-to weight ratio and is available as a factory-assembled package. The SGT-200 gas turbine combines simple design with state-of-the-art technology and is ideally suited for use, for example, as a compressor drive.